Skip to main content
Loading…
This section is included in your selections.

If utility installation work will encroach upon City rights-of-way, the person performing the work must obtain and comply with an encroachment/excavation permit. The encroachment/excavation permit will address excavation, backfilling, traffic control, and safety measures to be taken in connection with the work. All persons performing utility installation must maintain sufficient warning signage, barricades, and/or signals at or near every excavation. All signage or barriers shall be maintained in compliance with the Utah Manual on Uniform Traffic Control Devices (current version). (Ord. 19-14 (part), 2019)