Skip to main content
Loading…
This section is included in your selections.

Connection fees do not include the labor and materials required to complete any asphalt repairs. Owner/requester is responsible for completing this work in accordance with City standards and is subject to final inspection by the City.

Within the City (meter size/ERU capacity)

Meter provided by City

Meter provided by customer

5/8" x 3/4"

$1,746.60

$1,114.00

1"

$1,932.50

$1,114.00

1½"

$2,339.20

$1,212.00

2"

$2,577.40

$1,212.00

3"

$4,828.80

$1,506.00

4"

$5,500.90

$1,506.00

6"

$7,501.60

$1,506.00

Outside City Limit – additional 5% (meter size/ERU capacity)

Meter provided by City

Meter provided by customer

5/8" x 3/4"

$1,833.93

$1,169.70

1"

$2,029.13

$1,169.70

1½"

$2,456.16

$1,272.60

2"

$2,706.27

$1,272.60

3"

$5,070.24

$1,581.30

4"

$5,775.95

$1,581.30

6" (includes the meter)

$7,876.68

$1,581.30

Fire sprinkler system connection fee

Actual cost to perform the connection

Fire hydrant connection fee

Actual cost of installation

Fire hydrant meter deposit

$2,000.00

$2,000.00

(Ord. 23-11 Att. A, 2023; Ord. 22-06 Att. A, 2022: Ord. 20-07 Att. A (part), 2020; Ord. 19-24 Att. A (part), 2019)