Skip to main content
Loading…
This section is included in your selections.

Administrative costs (research)

$50.00/hr

Amended plats (boundary adjustment)

$250.00 plus $25.00/amended lot or unit

Annexation

$600.00 (flat rate)

Appeal authority submittal

$450.00

Cemetery application fee

$100.00

Cemetery bond

150% of total cost of improvements

Condominiums and condominium conversions

$350.00 plus $50.00/unit

Development code amendment application – Text amendment

Development code amendment application – Zone change – small residential (less than a ½ acre)

$350.00

Development code amendment application – Zone change – large residential or commercial

$500.00

Construction bond

In every construction contract where there is a modification of bonding requirements, or where no bonding is required (e.g., contracts under $50,000.00 in value), the construction contract shall contain one or more alternative security mechanisms to secure performance by the contractor and/or payment to subcontractors, laborers, and material suppliers. Alternative security mechanisms may include: (1) an irrevocable letter of credit payable to the City; (2) a first position deed of trust on real property; (3) a cash deposit to be held by the City; or (4) other collateral, contract, or security instruments as approved by the City Attorney.

Floodplain development permits and elevation certificates

$200.00

Floodplain reviews – for floodway and floodplain interpretations, delineations and reviews that exceed 1 hour.

$50.00/hr

Grading/excavation permit
Required for > 50 cubic yards or cuts or fills exceeding 10' deep or height

$50.00/each 100 cubic yards

General plan amendment

$350.00

Hillside development permits

$300.00 + $50.00/hr of staff review time that exceeds 10 hours

Hillside development – improvements and restoration bond

Amount reasonably calculated to cover anticipated costs for improvements, as determined by City Planning Director

Improvements agreement

Financial assurance

110% of the approved construction costs

Warranty deposit

10% of the approved construction costs

Landscaping – bond for new developments in summer and winter months

Amount reasonably calculated to cover anticipated costs for improvements, as determined by City Planning Director

Large-scale projects – fee structure for developers to underwrite City staff expenses

Amount reasonably calculated to cover anticipated costs for improvements, as determined by City Planning Director

Large-scale projects – over 30,000 ft2 – landscaping deposit
For completion of landscaping, in the event corrections cannot be made or installation cannot be completed prior to issuance of a certificate of occupancy.

1½ the cost of the landscaping project

Maps

D or E size (> 2'): $25.00
Digital files: $20.00

Master planned developments and planned unit development – application
(A separate fee is to be collected for preliminary and final plats)

$200.00 plus $25.00/dwelling unit or $25.00/
3,000 ft2 of floor area for commercial buildings

Master planned developments and planned unit development – bond

As required on a case by case basis by the City Planning Director

Mobile, manufactured or modular home parks and/or subdivisions – application

$200.00 plus $25.00/unit or lot

Mobile home parks – bond

Amount equal to the estimated cost, plus 50% of constructing all landscaping, roads, lighting, pedestrian ways, hard-surfacing, water and sewer lines, storage enclosures and common facilities as shown on the final plan.

Occupancy – cash-only bond if given permission by City Planner or designee to occupy prior to completion of building

150% of the cost of completing all required work, plus all administrative costs as determined by the governing body.

Parking, fee-in-lieu. Due prior to issuance of a building permit.

$8,500.00/parking space

Plan check fee

65% of the building permit fee for plans that are sent out to a professional plan checker; or $30.00/hour for plans that are checked by staff, with a $30.00 minimum.

Planned affordable development (PAD)

$50.00/1,000 ft2 of building floor area

Planning applications – miscellaneous

$100.00

Pre-application conference (sketch plan reviews)

$100.00 to be credited toward application fee

Professional services

Actual costs plus 10%

Reapplication fee

$300.00 plus appropriate subdivision plat fees

Recording fee

Actual costs

Recreational vehicle court

$200.00 plus $25.00/RV space

Right-of-way construction permit

$50.00

Sidewalks, curbs, gutters, and street paving, fee-in-lieu.
The City Engineer shall calculate by consulting licensed contractors.

110% of the estimated cost of constructing 200 lineal feet of the required improvements.

Sign permit

$50.00 plus $0.50 for each ft2 above 30 ft2

Sign, temporary – Political campaign signs

$15.00 permit

Site plan application fee ($100.00 min)**

$50.00/1,000 ft2 of building floor area

Site plan application resubmittal fee ($100.00 min)***

$25.00/1,000 ft2 of building floor area

Site plan review appeal

If the record is voluminous, appellant must pay the reasonable costs of assembly and copying of the record.

Special exception

$100.00

Street numbers, if City has to install

$20.00

Subdivisions
(A separate fee is to be collected for preliminary and final plats.)

$200.00 plus $25.00/lot

Subdivisions – bond

1½ times the cost of improvements not previously installed.

Trees – removing or damaging City-owned trees without permission

The basal area formula and the cost to buy, plant and water replacement trees shall be the basis for the urban forester to determine the replacement cost of the removed or damaged trees.

Water & sewer master plan mains extensions – deposit

Amount equal to the estimated cost of construction

Wireless telecommunications facility – application fee (for each separate monopole, lattice tower, or antenna)

$350.00

Zoning confirmation letter

$100.00

*Square foot construction costs are established using the International Code Council’s Building Valuation Data which is updated at 6-month intervals (February and August). Refunds for building permits issued will be limited to 80% of the permit costs, not later than 90 days after the date of fee payment.
**Site plan application fee is limited to two rounds of development review team (DRT) review.
***Site plan application resubmittal fee is charged per each resubmittal review.

(Ord. 23-11 Att. A, 2023; Ord. 23-06 Att. A, 2023; Ord. 22-06 Att. A, 2022: Ord. 20-07 Att. A (part), 2020; Ord. 19-24 Att. A (part), 2019)