Skip to main content
Loading…
This section is included in your selections.

Public works leads

Actual labor cost/hr

Parks worker

Actual labor cost/hr

Sewer service worker

Actual labor cost/hr

Water worker

Actual labor cost/hr

Street/storm water worker

Actual labor cost/hr

Facilities workers

Actual labor cost/hr

Other Public Works staff. Includes the time for loading or unloading prior to and after an event

Actual labor cost/hr

Overtime service fee

1½ times hourly rate

Traffic control and safety equipment

36" cone

$0.40/day

Vertical flats

$0.60/day

Signs w/ stand

$2.50/day

Barrels

$0.60/day

Candlestick

$0.50/day

Slide top

$5.50/day

Barricades

$3.00/day

Electronic message board (Labor rates apply in addition to rental fee)

$50.00/day

Jersey barrier (Labor rates apply in addition to rental fee)

$25.00/day

Other items and equipment

Assessed as needed

Equipment rental fees:

Reference FEMA for current rates. https://www.fema.gov/assistance/public/tools-resources/schedule-equipment-rates

Encroachment Permit Fees

New roads or newly resurfaced roads less than 3 years old. (Seamless patch required.) A total resurfacing of the road may be required as determined by the City.

$500.00 + $2.00/sq. ft.

Directional boring of a new road or newly resurfaced road less than 3 years

$300.00 for directional boring/+ $2.00/sq. ft. for each pothole required for the purpose of relocating existing utilities.

Roads 3 to 5 years old (Seamless patch required)

$250.00 + $1.50/sq. ft.

Roads 5 to 10 years old

$150.00 + $1.00/sq. ft.

Roads 10 to 15 years old

$125.00 + $1.00/sq. ft.

All roads older than 15 years

$100.00 + $1.00/sq. ft.

All curb cuts and sidewalk

$100.00 + $1.00/sq. ft.

Curb cut driveway approach – 16' at bottom of cut with 3' wings on each side 22' total

$122.00

Curb cut driveway approach – 22' at bottom of cut with 3' wings on each side 28' total

$128.00

Curb cut driveway approach – 32' at bottom of cut with 3' wings on each side 38' total

$138.00

(Ord. 23-11 Att. A, 2023; Ord. 23-06 Att. A, 2023; Ord. 22-06 Att. A, 2022: Ord. 20-07 Att. A (part), 2020; Ord. 19-24 Att. A (part), 2019)