Skip to main content
Loading…
This section is included in your selections.

A stormwater drainage system subject to review by the City Engineer and the approval of the public works director and city planner, shall be required by the City and e the responsibility of the project applicant. The system shall be separate and independent of the sanitary sewer system. The plans for the drainage system shall be prepared by a licensed engineer. The costs associated for this study shall be the sold responsibility of the project applicant. (Ord. 95-20 (part), 1995: Ord. 13-81 (part), 1981: prior code § 22-5-1(2))