Skip to main content
Loading…
This section is included in your selections.

Where a public sanitary sewer is reasonably accessible (within two hundred feet from the outside boundary of a subdivision), the subdivider shall connect with such sanitary sewer and provide adequate sewer lines accessible to the property line of each lot. The subdivider shall install a wye connection for each lot in the subdivision at the time the sewer main is laid. The sewer line will be stubbed in to all lots of record fronting the street before any paving is installed. When a subdivider is required to make connections to lots not in his subdivisions, the City shall credit the subdivider one hundred fifty dollars per lot. When service is late requested for said lots, the property owner will pay fees as stipulated in Section 13.08.070, Fees. Sewer connections and subdivision sewer systems shall be installed in accordance with the City specifications under the direction of the City Engineer. Where a public sewer is not reasonably accessible, the subdivider, upon approval of the City Council, may either install individual sewer facilities at his expense or require that builders provide such facilities as part of the construction of buildings or structures. Where individual sewerage facilities are to be installed, the City Council shall be assured that the sanitary condition of the land will be fully safeguarded. (Ord. 13-81 (part), 1981: prior code § 22-5-1(1))